High Pressure Gas Pipeline Contractor (GITS) | Palm Beach County

High Pressure Gas Pipeline Contractors are those who are qualified as a fuel transmission and distribution line contractor who have the experience and skill to excavate for and construct, alter, repair and maintain transmission and distribution lines for liquid or gaseous fuels under pressure in welded pipes, valves, meters and similar components as required to complete the system.

High Pressure Gas Pipeline Contractor Courses

High Pressure Gas Pipeline Exams (Trade and Business)

High Pressure Gas Pipeline Exam

  • Exam: RIE1C
  • Testing Method: Open book
  • Testing Company: GITS (Gainesville Independent Testing Service)
  • Hours Alloted: 2h
  • Types of Questions: Multiple Choice
  • Number of questions: 50
  • Subjects Involved:
    • Safety OSHA
    • General Knowledge
    • Concrete Pipe Installation
    • Ductile Pipe Installation
    • Design Elevations

Business Procedures Exam

  • Exam: AAE2C
  • Testing Method: Open Book
  • Testing Company: GITS (Gainesville Independent Testing Service)
  • Hours Allotted: 2h
  • Types of Questions: Multiple Choice
  • Number of questions: 50
  • Subjects Involved:
    • Insurance Laws
    • Tax Laws
    • Safety
    • Management
    • Lien Laws
    • Employment Laws
    • General Accounting

Bookset For High Pressure Gas Pipeline Contractor

The books set includes all required references for both the High Pressure Gas Pipeline and Business Procedures exams. Orders placed before 2 PM are shipped the same day via UPS and a tracking number is emailed before 3 PM.

PALM BEACH COUNTY (FLORIDA) HIGH PRESSURE GAS PIPELINE (GITS) - BOOK SET WITHOUT TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS

Sales price: $270.92

PALM BEACH COUNTY (FLORIDA) HIGH PRESSURE GAS PIPELINE (GITS) - BOOK SET WITH TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS

Sales price: $330.92

High Pressure Gas Pipeline Books

OSHA is required for both the business and the trade exams.

  • CFR (OSHA) Tile 29 Part 1926

    CFR (OSHA) Tile 29 Part 1926

    OSHA (CFR 29 Part 1926) is the leading safety reference in the construction industry covering all aspects of construction.
    $29.87
    $29.87
    Tabs:
    Quantity:
  • Design and Control of Concrete Mixtures

    Design and Control of Concrete Mixtures

    Many advances have been made in concrete technology over the decades ranging from new materials and testing methods, to improved concrete properties and construction practices. Concrete construction today follows a mantra of quicker, stronger, more durable, more resilient, and more sustainable. That story is proudly displayed within the pages of this centennial edition of Design and Control of Concrete Mixtures.
    $71.14
    $71.14
    Tabs:
    Quantity:
  • Installation Guide for Ductile Iron Pipe

    Installation Guide for Ductile Iron Pipe

    The Installation Guide for Ductile Iron Pipe is an important reference used by Underground Utilities and Excavation Contractors in Florida.
    $24.58
    $24.58
    Tabs:
    Quantity:
  • AWWA Standard for Installation of Ductile Iron Water Mains, AWWA C-600

    AWWA Standard for Installation of Ductile Iron Water Mains, AWWA C-600

    This reference provides information on the minimum standard requirements for the installation and use of correct materials, dimensions, tolerances, and testing procedures of ductile-iron water mains and their appurtenances.
    $75.90
    $75.90
    Tabs:
    Quantity:

Business Procedures Books

OSHA is required for both the business and the trade exams.

  • Florida Contractor's Business Procedures Reference Manual

    Florida Contractor's Business Procedures Reference Manual

    This book includes many of the aspects of operating a business related to the construction industry and shows everything there is to know about the proper way to file taxes; what insurance to carry; how to manage daily accounts, and how, when, and why to file a paperwork for a lien.
    $69.43
    $69.43
    Tabs:
    Quantity:
  • CFR (OSHA) Tile 29 Part 1926

    CFR (OSHA) Tile 29 Part 1926

    OSHA (CFR 29 Part 1926) is the leading safety reference in the construction industry covering all aspects of construction.
    $29.87
    $29.87
    Tabs:
    Quantity: