Collier County Contractor Experience Requirements

Major Trades

  • General Contractor: 48 Months
  • Building Contractor: 48 Months
  • Residential Contractor: 48 Months
  • Mechanical Contractor: 48 Months as Journeyman
  • Class A Air conditioning Contractor: 36 Months as Journeyman
  • Class B Air Conditioning Contractor: 36 Months as Journeyman
  • Class C Air COnditioning Contractor: 24 Months as Journeyman
  • Master Electrician: 24 Months as Journeyman & 48 Months as Apprentice
  • Master Plumber: 24 Months as Journeyman & 48 Months as Apprentice
  • Journeyman Electrician: 48 Months as Apprentice
  • Journeyman Plumber: 48 Months as Apprentice
  • Journeyman Air Conditioning: 48 Months
  • Swimming Pool Class A (commercial): 36 Months
  • Swimming Pool Class B (Residential): 24 Months
  • Swimming Pool Class C (Service): 24 Months

Specialty Trades

  • Acoustical: 24 Months
  • Aluminum/Screen Enclosure: 24 Months
  • Aluminum/Screen Enclosure w/Concrete: 24 Months
  • Alarm System I (Burglar & Fire): 24 Months
  • Alarm System II (Burglar Only | Less than 5,000 SF): 24 Months
  • Cabinet Installation: 24 Months
  • Carpentry: 36 Months
  • Concrete Forming and Placing: 36 Months
  • Concrete Placing and Finishing: 36 Months
  • Concrete (Pneumatically placed only): 24 Months
  • Decorative Metal: 24 Months
  • Demolition or Wrecking: 36 Months
  • Dredging: 36 Months
  • Drywall: 36 Months
  • Epoxy Stone: 24 Months
  • Excavation: 36 Months
  • Exterior Covering by Artificial Stucco System: 24 Months
  • Fence Erection: 24 Months
  • Floor Covering Installation: 24 Months
  • Garage Door Installation: 12 Months
  • Gasoline Tank and Pump: 48 Months
  • Glass and Glazing: 24 Months
  • Hurricane Shutter/Awning: 24 Months
  • Insulation (All Types except Building): 36 Months
  • Insulation (Building): 24 Months
  • Irrigation Sprinkler: 24 Months
  • Landscaping Restricted: 12 Months
  • Marine, Seawall & Dock Construction: 36 Months
  • Masonry: 36 Months
  • Nonrecreational Pond Waterfall Fountain: 24 Months
  • Painting: 24 Months
  • Paving (Commercial or Unlimited): 36 Months
  • Paving Blocks: 24 Months
  • Plastering and Stucco: 36 Months
  • Reinforced Steel: 36 Months
  • Roof Painting, Coating, and Cleaning: 24 Months
  • Roofing Unlimited: 36 Months
  • Sandblasting: 24 Months
  • Satellite Dish Installation: 24 Months
  • Sealing and Striping: 24 Months
  • Sheet Metal: 24 Months
  • Structural Steel Erection: 36 Months
  • Swimming Pool/Spa Servicing/Repair: 24 Months
  • Tile and Marble: 24 Months
  • Tile, Marble, and Terrazzo: 24 Months
  • Tree Removal and Trimming: 12 Months
  • Underground Utility and Excavation: 48 Months