Article Index
Page 1 of 2
City of Indian River Shores Permits
To view license requirements, definition, exams, books, and classes, please visit Indian River shores.
Permits
- Building permit application
- Excavator
- Plumbing
- Concrete
- Electrical
- Cement
- A/C & Heat
- Carpenter
- Roof
- Insulation
- Security
- Drywall
- Sheet Metal
- Painting
- Gas
- Glazing
- Stucco
- Enclosure/Pool Net
- Mason
- Hurricane Protection
- Roofing Permit Application
- Shingles
- Metal
- Tile
- Roof over
- Flat
- Roof Slope
- Existing roof covering
- New roof covering
- Tree Removal Perit Application Fee
- Demolition Permitting Checklist
- Land Clearing Permit Application
- Required Submissions:
- Legal Description
- Tree Survey Written explanation
- Erosion Control Plan / Reasons
- Site Plan or Subdivision Plat
- Landscape Permit Application
- State Building Permit and Inspection Utilization Report
- Generator Permit Application
- Town of Indian River Shores Building Permit and Inspection Utilization
- Direct and indirect costs incurred by the local government to enforce the Florida Building Code, including costs related to:
- Personnel services costs, including salary and related employee benefit costs incurred by the local government to enforce the Florida Building Code: $384,425
- Operating expenditures and expenses: $229,993.97
- Multi-Trade Permit Application
- Windows/Doors
- Shutters
- Dock/Boat Lift
- Dune Crossover
- Swimming Pools
- Screen Enclosure
- Mechanical (Residential)
- Electric
- Plumbing
- Insulation
- Gas
- Garage Doors
- Temp Trailer/Tent
- Driveway/Pavers
- Solar
- Irrigation
- Sign
- Wall
- Fence
- Yard Fence
- Pool Barrier Fence- Pool Built
- Generator
- Storm Water, Erosion, and Sedimententation Control Permit Application
- Required Submissions with Applications:
- Erosion Control Plan
- Site Plan of Subdivision Plat
- Copy of NPDES Inspector Certificate
- Rain gauge is required on site
- Demolition Permitting Checklist
- Subcontractor Affidavits
- Survey Signed & Sealed
- Pest Control Inspection Report
- Above and Below Ground Liquified Petroleum and Oil Tank Removal Verification
- Florida Power and Light Disconnect Letter
- Water Meter Removal Letter & spigot for wet demolition
- Sewer capped & stubbed up 3ft.
- Copy of EPA License and letter from contractor regarding recovery of refrigerants
- Septic Tank Removal- Department of Health Inspection
- Backflow preventer installation
- Construction barrier and silt fencing
- Tree protection with 2" x 2" stakes arid perimeter marking tape
- Wet demolition required for dust control
- Fire Service Water Meter/Main Removal Letter (Commercial only)
- Stormwater Pollution Plan and Permit
- Landclearing permit / Soil stabilization/grass
- Demolition Plan
A pre-demolition inspection is required. It is unlawful for any person to perform or engage in any construction work within the town between the hours of 7:00 pm and 7:00am the next day. This excludes any gated communities. It is the contractor’s responsibility to obtain the allowable work times for each community
- Details
- Written by S. Alfonzo