Article Index

City of Indian River Shores Permits

To view license requirements, definition, exams, books, and classes, please visit Indian River shores.

Permits

    • Building permit application
      • Excavator
      • Plumbing
      • Concrete
      • Electrical
      • Cement
      • A/C & Heat
      • Carpenter
      • Roof
      • Insulation
      • Security
      • Drywall
      • Sheet Metal
      • Painting
      • Gas
      • Glazing
      • Stucco
      • Enclosure/Pool Net
      • Mason
      • Hurricane Protection
    • Roofing Permit Application
      • Shingles
      • Metal
      • Tile
      • Roof over
      • Flat
      • Roof Slope
      • Existing roof covering
      • New roof covering
    • Tree Removal Perit Application Fee
    • Demolition Permitting Checklist
    • Land Clearing Permit Application
      • Required Submissions:
      • Legal Description
      • Tree Survey Written explanation
      • Erosion Control Plan / Reasons
      • Site Plan or Subdivision Plat
    • Landscape Permit Application
    • State Building Permit and Inspection Utilization Report
    • Generator Permit Application
    • Town of Indian River Shores Building Permit and Inspection Utilization
      • Direct and indirect costs incurred by the local government to enforce the Florida Building Code, including costs related to:
      • Personnel services costs, including salary and related employee benefit costs incurred by the local government to enforce the Florida Building Code: $384,425
      • Operating expenditures and expenses: $229,993.97
    • Multi-Trade Permit Application
      • Windows/Doors
      • Shutters
      • Dock/Boat Lift
      • Dune Crossover
      • Swimming Pools
      • Screen Enclosure
      • Mechanical (Residential)
      • Electric
      • Plumbing
      • Insulation
      • Gas
      • Garage Doors
      • Temp Trailer/Tent
      • Driveway/Pavers
      • Solar
      • Irrigation
      • Sign
      • Wall
      • Fence
      • Yard Fence
      • Pool Barrier Fence- Pool Built
      • Generator
    • Storm Water, Erosion, and Sedimententation Control Permit Application
      • Required Submissions with Applications:
      • Erosion Control Plan
      • Site Plan of Subdivision Plat
      • Copy of NPDES Inspector Certificate
      • Rain gauge is required on site
    • Demolition Permitting Checklist
      • Subcontractor Affidavits
      • Survey Signed & Sealed
      • Pest Control Inspection Report
      • Above and Below Ground Liquified Petroleum and Oil Tank Removal Verification
      • Florida Power and Light Disconnect Letter
      • Water Meter Removal Letter & spigot for wet demolition
      • Sewer capped & stubbed up 3ft.
      • Copy of EPA License and letter from contractor regarding recovery of refrigerants
      • Septic Tank Removal- Department of Health Inspection
      • Backflow preventer installation
      • Construction barrier and silt fencing
      • Tree protection with 2" x 2" stakes arid perimeter marking tape
      • Wet demolition required for dust control
      • Fire Service Water Meter/Main Removal Letter (Commercial only)
      • Stormwater Pollution Plan and Permit
      • Landclearing permit / Soil stabilization/grass
      • Demolition Plan

A pre-demolition inspection is required. It is unlawful for any person to perform or engage in any construction work within the town between the hours of 7:00 pm and 7:00am the next day. This excludes any gated communities. It is the contractor’s responsibility to obtain the allowable work times for each community