Article Index

City of Indian River Shores Permits

To view license requirements, definition, exams, books, and classes, please visit Indian River shores.

Permits

  • Building permit application
    • Excavator
    • Plumbing
    • Concrete
    • Electrical
    • Cement
    • A/C & Heat
    • Carpenter
    • Roof
    • Insulation
    • Security
    • Drywall
    • Sheet Metal
    • Painting
    • Gas
    • Glazing
    • Stucco
    • Enclosure/Pool Net
    • Mason
    • Hurricane Protection
  • Roofing Permit Application
    • Shingles
    • Metal
    • Tile
    • Roof over
    • Flat
    • Roof Slope
    • Existing roof covering
    • New roof covering
  • Tree Removal Perit Application Fee
  • Demolition Permitting Checklist
  • Land Clearing Permit Application
    • Required Submissions:
    • Legal Description
    • Tree Survey Written explanation
    • Erosion Control Plan / Reasons
    • Site Plan or Subdivision Plat
  • Landscape Permit Application
  • State Building Permit and Inspection Utilization Report
  • Generator Permit Application
  • Town of Indian River Shores Building Permit and Inspection Utilization
    • Direct and indirect costs incurred by the local government to enforce the Florida Building Code, including costs related to:
    • Personnel services costs, including salary and related employee benefit costs incurred by the local government to enforce the Florida Building Code: $384,425
    • Operating expenditures and expenses: $229,993.97
  • Multi-Trade Permit Application
    • Windows/Doors
    • Shutters
    • Dock/Boat Lift
    • Dune Crossover
    • Swimming Pools
    • Screen Enclosure
    • Mechanical (Residential)
    • Electric
    • Plumbing
    • Insulation
    • Gas
    • Garage Doors
    • Temp Trailer/Tent
    • Driveway/Pavers
    • Solar
    • Irrigation
    • Sign
    • Wall
    • Fence
    • Yard Fence
    • Pool Barrier Fence- Pool Built
    • Generator
  • Storm Water, Erosion, and Sedimententation Control Permit Application
    • Required Submissions with Applications:
    • Erosion Control Plan
    • Site Plan of Subdivision Plat
    • Copy of NPDES Inspector Certificate
    • Rain gauge is required on site
  • Demolition Permitting Checklist
    • Subcontractor Affidavits
    • Survey Signed & Sealed
    • Pest Control Inspection Report
    • Above and Below Ground Liquified Petroleum and Oil Tank Removal Verification
    • Florida Power and Light Disconnect Letter
    • Water Meter Removal Letter & spigot for wet demolition
    • Sewer capped & stubbed up 3ft.
    • Copy of EPA License and letter from contractor regarding recovery of refrigerants
    • Septic Tank Removal- Department of Health Inspection
    • Backflow preventer installation
    • Construction barrier and silt fencing
    • Tree protection with 2" x 2" stakes arid perimeter marking tape
    • Wet demolition required for dust control
    • Fire Service Water Meter/Main Removal Letter (Commercial only)
    • Stormwater Pollution Plan and Permit
    • Landclearing permit / Soil stabilization/grass
    • Demolition Plan

A pre-demolition inspection is required. It is unlawful for any person to perform or engage in any construction work within the town between the hours of 7:00 pm and 7:00am the next day. This excludes any gated communities. It is the contractor’s responsibility to obtain the allowable work times for each community


Contact Information

City of Indian River shores

  • Hours of Operation: Monday- Friday, 8 am - 4:30 pm, (closed 12-1 for lunch)
  • Address:Town Hall - Indian River Shores Building Department (South Building) 6001 N. State Road A1A Indian River Shores, FL 32963
  • Phone Number: (772) 231-4453