Collier County Contractor Experience Requirements
Major Trades
- General Contractor: 48 Months
- Building Contractor: 48 Months
- Residential Contractor: 48 Months
- Mechanical Contractor: 48 Months as Journeyman
- Class A Air conditioning Contractor: 36 Months as Journeyman
- Class B Air Conditioning Contractor: 36 Months as Journeyman
- Class C Air COnditioning Contractor: 24 Months as Journeyman
- Master Electrician: 24 Months as Journeyman & 48 Months as Apprentice
- Master Plumber: 24 Months as Journeyman & 48 Months as Apprentice
- Journeyman Electrician: 48 Months as Apprentice
- Journeyman Plumber: 48 Months as Apprentice
- Journeyman Air Conditioning: 48 Months
- Swimming Pool Class A (commercial): 36 Months
- Swimming Pool Class B (Residential): 24 Months
- Swimming Pool Class C (Service): 24 Months
Specialty Trades
- Acoustical: 24 Months
- Aluminum/Screen Enclosure: 24 Months
- Aluminum/Screen Enclosure w/Concrete: 24 Months
- Alarm System I (Burglar & Fire): 24 Months
- Alarm System II (Burglar Only | Less than 5,000 SF): 24 Months
- Cabinet Installation: 24 Months
- Carpentry: 36 Months
- Concrete Forming and Placing: 36 Months
- Concrete Placing and Finishing: 36 Months
- Concrete (Pneumatically placed only): 24 Months
- Decorative Metal: 24 Months
- Demolition or Wrecking: 36 Months
- Dredging: 36 Months
- Drywall: 36 Months
- Epoxy Stone: 24 Months
- Excavation: 36 Months
- Exterior Covering by Artificial Stucco System: 24 Months
- Fence Erection: 24 Months
- Floor Covering Installation: 24 Months
- Garage Door Installation: 12 Months
- Gasoline Tank and Pump: 48 Months
- Glass and Glazing: 24 Months
- Hurricane Shutter/Awning: 24 Months
- Insulation (All Types except Building): 36 Months
- Insulation (Building): 24 Months
- Irrigation Sprinkler: 24 Months
- Landscaping Restricted: 12 Months
- Marine, Seawall & Dock Construction: 36 Months
- Masonry: 36 Months
- Nonrecreational Pond Waterfall Fountain: 24 Months
- Painting: 24 Months
- Paving (Commercial or Unlimited): 36 Months
- Paving Blocks: 24 Months
- Plastering and Stucco: 36 Months
- Reinforced Steel: 36 Months
- Roof Painting, Coating, and Cleaning: 24 Months
- Roofing Unlimited: 36 Months
- Sandblasting: 24 Months
- Satellite Dish Installation: 24 Months
- Sealing and Striping: 24 Months
- Sheet Metal: 24 Months
- Structural Steel Erection: 36 Months
- Swimming Pool/Spa Servicing/Repair: 24 Months
- Tile and Marble: 24 Months
- Tile, Marble, and Terrazzo: 24 Months
- Tree Removal and Trimming: 12 Months
- Underground Utility and Excavation: 48 Months