(GITS©) Concrete Forming and Placing Contractor License Putnam County

A Concrete Forming and Placing Contractor is qualified to select, cut and lay brick and concrete block or any other unit masonry products; rough cut and dress stone, artificial stone and pre-cast blocks, structural glass brick or block, pour, place and finish concrete, foundations and flatwork (footers, floors, slab on grade, sidewalks, etc) including placement of mesh reinforcement, plastic vapor barriers and edge forms incidental thereto.

Courses for Concrete Forming and Placing

Exams for Concrete Forming and Placing

Concrete Forming and Placing Exam

  • Exam: BCE1P
  • Testing Method: Open book
  • Testing Company: GITS (Gainesville Independent Testing Service)
  • Hours Alloted: 2h
  • Types of Questions: Multiple Choice
  • Number of questions: 50
  • Subjects Involved:
    • Earthwork
    • Safety
    • Concrete
    • Reinforcement
    • Formwork
    • Estimating & Plan Reading

Business and Law Exam

  • Exam: AAE2A
  • Testing Method: Open Book
  • Testing Company: GITS (Gainesville Independent Testing Service)
  • Hours Allotted: 2h
  • Types of Questions: Multiple Choice
  • Number of questions: 50
  • Subjects Involved:
    • Insurance Laws
    • Tax Laws
    • Safety
    • Management
    • Lien Laws
    • Employment Laws
    • General Accounting

Book Set For Concrete Forming And Placing

The books set includes all required references for both the Concrete Forming and Placing and Business Procedures exams. Orders placed before 2 PM are shipped the same day via UPS and a tracking number is emailed before 3 PM.

PUTNAM COUNTY (FLORIDA) CONCRETE FORMING AND PLACING (GITS) - BOOK SET WITHOUT TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS

Sales price: $622.78

PUTNAM COUNTY (FLORIDA) CONCRETE FORMING AND PLACING (GITS) - BOOK SET WITH TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS

Sales price: $682.78

Concrete Forming and Placing Books

OSHA is required for both the business and the trade exams.

  • CFR (OSHA) Tile 29 Part 1926

    CFR (OSHA) Tile 29 Part 1926

    OSHA (CFR 29 Part 1926) is the leading safety reference in the construction industry covering all aspects of construction.
    $29.87
    $29.87
    Tabs:
    Quantity:
  • Formwork for Concrete

    Formwork for Concrete

    Formwork for Concrete is published by ACI (American Concrete Institute) and is used for contractor testing by several counties in Florida.
    $320.15
    $320.15
    Tabs:
    Quantity:
  • Excavation and Grading Handbook

    Excavation and Grading Handbook

    Excavation and Grading Handbook is an important reference for excavation contractors, specially those testing in Florida for a county license in said trade.
    $44.23
    $44.23
    Tabs:
    Quantity:
  • Design and Control of Concrete Mixtures

    Design and Control of Concrete Mixtures

    Many advances have been made in concrete technology over the decades ranging from new materials and testing methods, to improved concrete properties and construction practices. Concrete construction today follows a mantra of quicker, stronger, more durable, more resilient, and more sustainable. That story is proudly displayed within the pages of this centennial edition of Design and Control of Concrete Mixtures.
    $71.14
    $71.14
    Tabs:
    Quantity:
  • Placing Reinforcing Bars

    Placing Reinforcing Bars

    Placing Reinforcing Bars covers all aspects of concrete reinforcement.
    $87.96
    $87.96
    Tabs:
    Quantity:

Business and Law Books

OSHA is required for both the business and the trade exams.

  • Florida Contractor's Business Procedures Reference Manual

    Florida Contractor's Business Procedures Reference Manual

    This book includes many of the aspects of operating a business related to the construction industry and shows everything there is to know about the proper way to file taxes; what insurance to carry; how to manage daily accounts, and how, when, and why to file a paperwork for a lien.
    $69.43
    $69.43
    Tabs:
    Quantity:
  • CFR (OSHA) Tile 29 Part 1926

    CFR (OSHA) Tile 29 Part 1926

    OSHA (CFR 29 Part 1926) is the leading safety reference in the construction industry covering all aspects of construction.
    $29.87
    $29.87
    Tabs:
    Quantity: