New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor License

The Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor License allows you to do the following work:

  • Construct, build, and place lines for the transmission or conveyance of:
    • Petroleum
    • Water
    • Natural gas
    • Other fluid substances
  • Compacting, paving, and surfacing necessary and incidental to the completion of the installation of such facilities
  • Application of protective coatings
  • Trenching
  • Boring
  • Shoring
  • Backfilling
  • Compacting
  • Incidental buildings
  • Tanks
  • Substations
  • Construct, repair, or alter industrial plants, including, but not limited to, refineries and power generation plants

How to Get the Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor License in New Mexico?

  1. Meet the experience requirement:
    • At least two years of documented experience in the Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor field.
  2. Apply for eligibility through PSI©.
  3. Send these documents via mail with the corresponding application fee to:
    PSI©
    2820 Broadbent Pkwy NE Suites E & F
    Albuquerque, NM 87107

    877-663-9267
  4. Once the documents and the eligibility have been approved, schedule and pay for the examination.
  5. Take and pass the following examinations:
    • New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Trade Exam.
    • New Mexico CORE (GF) Contractor Trade Exam.
    • New Mexico Business and Law Examination (PSI©).
  6. After passing the examination, complete the Application for Contractor License and the Construction Industries Division Contractor License Code Bond.
  7. Gather the following documents and send them by mail to PSI©: PSI©
    2820 Broadbent Pkwy NE Suites E & F
    Albuquerque, NM 87107

    (877) 663-9267
  8. Once accepted, the license will be delivered via USPS.

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor License Exam Prep Courses

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor License Exams

Below is all the information related to the trade, GF-Core, and Business and Law exams, including the official reference lists.

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Trade Exam

New Mexico CORE (GF) Contractor Trade Exam

  • Testing Method: Computer-based testing
  • Testing Company: PSI©
  • Number of Questions: 40
  • Types of Questions: Multiple choice
  • Time Allowed: 100 Minutes
  • Minimum Passing Score: 75% (30 points)
  • Subjects Involved (No. of Questions):
    • Stormwater Management (10)
    • OSHA Safety (8)
    • Project Management (6)
    • Surveying / Layout (5)
    • New Mexico One-Call (6)
    • Building Code / Inspections (5)
  • PSI© CORE (GF) Official Content Outline

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Business and Law Examination

  • Testing Method: Computer-based testing
  • Testing Company: PSI©
  • Number of Questions: 50
  • Types of Questions: Multiple choice
  • Time Allowed: 130 Minutes
  • Minimum Passing Score: 75% (38 points)
  • Subjects Involved (No. of Questions):
    • Licensing Requirements (8)
    • Estimating and Bidding (5)
    • Business Organization and Financial Management (8)
    • Tax Laws (5)
    • Labor Laws (4)
    • Project Management and Lien Law (5)
    • Contracts (8)
    • Risk Management (4)
    • Environmental and Safety (3)
  • PSI© Business & Law Official Content Outline

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Book Set

This set of books includes all required references for the GF Core, Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) and Business and Law exams. Orders placed before 2 PM are shipped the same day via UPS and a tracking number is emailed before 3 PM.

  • NEW MEXICO TRANSMISSION LINES, TANKS, AND SUBSTATIONS (NONELECTRICAL) (GF-8) - BOOK SET WITHOUT TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS

    Sales price: $2,314.30
  • NEW MEXICO TRANSMISSION LINES, TANKS, AND SUBSTATIONS (NONELECTRICAL) (GF-8) - BOOK SET WITH TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS

    Sales price: $2,414.30

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Exam Books

Books Allowed in Testing

New Mexico CORE (GF) Contractor Exam Books

Books Allowed in Testing

New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Business and Law Examination Books

Books Allowed in Testing