New Mexico Fixed Works (GF-98) Contractor License
The Fixed Works (GF-98) Contractor License allows you to do the following work:
- Construct, alter or repair fixed or public works facilities
- Fixed works licensees may not construct buildings primarily for the general public's use and occupancy but may bid and contract for such buildings when they are incidental to a fixed works project; however, such work must be subcontracted pursuant to Subsection B of 14.6.6.8 NMAC
- Incidental storage buildings used exclusively for storage and not for occupancy are allowed within these classifications
- All work from classifications GF-1 through GF-9 is allowed:
Airports (GF-1):
- Construct, alter and repair airports
- Work on surfaces for aircraft traffic, landing, take-off, and taxi
- Excavating
- Grading
- Compacting
- Sub-surfacing
- Surfacing (dirt or bitumen and concrete)
- Marking
Bridges (GF-2):
- Overpass or underpass, culvert or ramp, generally used for vehicular traffic
- Erect, construct, alter, repair, or demolish any bridge
Canals, Reservoirs, or Irrigation Systems (GF-3):
- Excavate, ditch, fill, compact, and place pre-cast components, waterproof membranes and liners, concrete reinforcement, abutments, and buttresses in connection therewith
- Install tanks, pumps, pipelines, and substations incidental to the project
- Irrigation activities and piping, when applicable solely to the production of agriculture or maintenance of livestock on a farm or ranch, without electrical work, are exempt from licensing requirements
- Construct, erect, alter, repair, or demolish:
- Canals
- Dams
- Reservoirs
- Irrigation systems
Drainage or Flood Control Systems (GF-4):
- About flooding control systems or drainage:
- Construct
- Erect
- Install
- Repair and alter
- Dig
- Excavate
- Fill
- Concrete reinforcement
- Prepare embankments
- Place pre-cast components
- Install storm sewers
- Including trenching
- Boring
- Shoring
- Backfilling
- Compacting
- Paving
- About flooding control systems or drainage:
Recreation Areas (GF-5):
- Construct, prepare, clear, repair, or alter:
- Facilities for use as recreation areas
- Including but not limited to golf courses
- Driving ranges
- Water parks
- Tennis courts
- Playgrounds
- Outdoor athletic facilities
- Miniature golf courses
- Pitch-and-putt golf courses
- Prepare the area by excavation
- Fill
- Including foundations
- Retaining walls
- Sprinkler systems
- Rest benches
- Shade and rain shelters and foot bridges relative to recreation areas
- Public campgrounds and parks or similar facilities
- Including toilet facilities and lean-tos
- Construct, prepare, clear, repair, or alter:
Railroad and Tunnel Construction (GF-6):
- Concerning railroad lines:
- Construct
- Clearing
- Filling
- Shaping
- Compacting
- Placing rip-rap
- Stabilizing
- Setting roadbeds
- Ties
- Tie plates
- Rails
- Rail connectors
- Frogs
- Switch plates
- Switches
- All appurtenances necessary for an operational railroad line
- Bridges
- Culverts
- Tunnels
- Retaining walls
- Dikes
- Gates
- Tool sheds and landing or parking platforms for equipment
- Includes welding operations necessary for rail construction
- Concerning railroad lines:
Tanks and Tower (GF-7):
- Construct or fabricate on-site and install tanks for the storage of solids or liquids, above or below ground, and towers such as:
- Radio
- Television and telecommunications towers
- Including all necessary site work
- Excavation and construction of concrete tanks
- Pads and foundations
- Cutting
- Welding
- Placement of structural members
- Engineered structural support systems for elevated tanks
- Engineered or prefabricated towers
- Repair and placement of liners in tanks
- Incidental storage buildings
- Construct or fabricate on-site and install tanks for the storage of solids or liquids, above or below ground, and towers such as:
Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8):
- Construct, build, and place lines for the transmission or conveyance of:
- Natural gas
- Petroleum
- Water
- Other fluid substances
- Application of protective coatings
- Trenching
- Boring
- Shoring
- Backfilling
- Compacting
- Compacting, paving, and surfacing necessary and incidental to the completion of the installation of such facilities
- Incidental buildings
- Tanks
- Substations
- Construct, alter, or repair industrial plants, including, but not limited to, refineries and power generation plants
- Construct, build, and place lines for the transmission or conveyance of:
Utility Lines (GF-9):
- Construct, install, alter or repair utility lines and utility systems for the transmission of sewage, natural gas, and water
- Excavating
- Grading
- Trenching
- Boring
- Shoring
- Backfilling
- Compacting
- Paving and surfacing
- Tanks
- Pumps
- Lift-stations and substations
- Construct, alter, or repair treatment plants and facilities incidental to that
- Install direct burial communications cable by trenching
- Direct plowing or pulling direct burial cable through existing raceways and installation vaults as directed by the telecommunications utility
- Associated excavating
How to Get the Fixed Works (GF-98) Contractor License in New Mexico?
- Meet the experience requirement:
- At least four years of documented experience in the Fixed Works (GF-98) Contractor field.
- Apply for eligibility through PSI©.
- Fill out the Qualifying Party Certificate.
- Complete the Work Experience Certificate.
- Send these documents via mail with the corresponding application fee to:
PSI©
2820 Broadbent Pkwy NE Suites E & F
Albuquerque, NM 87107
877-663-9267 - Once the documents and the eligibility have been approved, schedule and pay for the examination.
- To apply online, the candidates must:
- Sign in or create an account on the PSI© official website.
- Enter zip code for exam locations.
- Choose the corresponding examination and add the social security number.
- Pay for and schedule the exam.
- To apply by mail or fax:
- Open and check the General Construction Candidate Information Bulletin.
- Fill out the New Mexico Contractor Examination Registration Form.
- Pay the fees and send the documents via mail or fax to:
PSI©
2820 Broadbent Pkwy NE Suites E & F
Albuquerque, NM 87107
Fax: (702) 932-2666
877-663-9267
- If applying by phone, please fill out the Examination Registration Form and call PSI© registrars at (855) 807-3994
- If applying Out-of-State, fill out the Exam Accommodations Request Form and send it via email to
This email address is being protected from spambots. You need JavaScript enabled to view it. or fax it to (702) 932-2666.
- To apply online, the candidates must:
- Take and pass the following New Mexico contractor trade exams:
- CORE (GF)
- Airports (GF-1)
- Bridges (GF-2)
- Canals, Reservoirs, or Irrigation Systems (GF-3)
- Drainage or Flood Control Systems (GF-4)
- Recreation Areas (GF-5)
- Railroad and Tunnel Construction (GF-6)
- Tanks and Tower (GF-7)
- Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8)
- Utility Lines (GF-9)
- Business and Law Examination (PSI©)
- After passing the examination, complete the Application for Contractor License and the Construction Industries Division Contractor License Code Bond.
- Gather the following documents and send them by mail to PSI©:
- Contractor License Form
- CID Contractor License Code Bond
- Valid Qualifying Party Certificate
- Examination Passing Scores.
- Proof of Financial Responsibility Bond
- Proof of current New Mexico Tax ID number application with a registration certificate or official stamp.
2820 Broadbent Pkwy NE Suites E & F
Albuquerque, NM 87107
(877) 663-9267 - Once accepted, the license will be delivered via USPS.
New Mexico Fixed Works (GF-98) Contractor License Exam Prep Courses
New Mexico Fixed Works (GF-98) Contractor License Exams
Below is all the information related to the trade, GF-Core, and Business and Law exams, including the official reference lists.
New Mexico CORE (GF) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 40
- Types of Questions: Multiple choice
- Time Allowed: 100 Minutes
- Minimum Passing Score: 75% (30 points)
- Subjects Involved (No. of Questions):
- Stormwater Management (10)
- OSHA Safety (8)
- Project Management (6)
- Surveying / Layout (5)
- New Mexico One-Call (6)
- Building Code / Inspections (5)
- PSI© CORE (GF) Official Content Outline
New Mexico Airports (GF-1) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 75 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Sitework (10)
- Runways (15)
- FAA Regulations (3)
- Lighting (2)
- PSI© Airports (GF-1) Official Content Outline
New Mexico Bridges (GF-2) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 75 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Sitework (10)
- Concrete (6)
- Metals (3)
- Asphalt Pavement (6)
- Rigging (3)
- Project Management (2)
- PSI© Bridges (GF-2) Official Content Outline
New Mexico Canals, Reservoirs, or Irrigation Systems (GF-3) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 80 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Irrigation (10)
- Concrete (5)
- Sitework (15)
- PSI© Canals, Reservoirs, or Irrigation Systems (GF-3) Official Content Outline
New Mexico Drainage or Flood Control Systems (GF-4) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 75 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Earthwork (9)
- Culverts and Pipe (9)
- Concrete (9)
- Project Management (3)
- PSI© Drainage or Flood Control Systems (GF-4) Official Content Outline
New Mexico Recreation Areas (GF-5) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 80 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Sitework (15)
- Irrigation (6)
- Concrete (5)
- Project Management (4)
- PSI© Recreation Areas (GF-5) Official Content Outline
New Mexico Railroad and Tunnel Construction (GF-6) Contractor Trade Exam
- Testing Method: Written Essay
- Testing Company: PSI©
- Time Allowed: 2 Hours
- The written essay must include:
- Overview of tasks required to build railroads and tunnels.
- Step by step usage of labor, material, and equipment.
- Description of safe and efficient execution of projects.
- Description of projects completed in the past.
- PSI© Railroad and Tunnel Construction (GF-6) Official Content Outline
New Mexico Tanks and Tower (GF-7) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 80 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Miscellaneous Structures (7)
- Sitework / Excavation (3)
- Welding (4)
- Paving and Surfacing (3)
- Tanks (10)
- Towers (3)
- PSI© Tanks and Tower (GF-7) Official Content Outline
New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 30
- Types of Questions: Multiple choice
- Time Allowed: 125 Minutes
- Minimum Passing Score: 75% (23 points)
- Subjects Involved (No. of Questions):
- Tanks and Pipelines (12)
- Miscellaneous Structures / Corrosion Protection (6)
- Welding (4)
- Heavy Equipment / Safety (4)
- Paving and Surfacing (4)
- PSI© Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Official Content Outline
New Mexico Utility Lines (GF-9) Contractor Trade Exam
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 35
- Types of Questions: Multiple choice
- Time Allowed: 90 Minutes
- Minimum Passing Score: 75% (27 points)
- Subjects Involved (No. of Questions):
- Pipe/Miscellaneous Structures (15)
- Earthwork (7)
- Surface Repair (5)
- Project Management (8)
- PSI© Utility Lines (GF-9) Official Content Outline
New Mexico Fixed Works (GF-98) Business and Law Examination
- Testing Method: Computer-based testing
- Testing Company: PSI©
- Number of Questions: 50
- Types of Questions: Multiple choice
- Time Allowed: 130 Minutes
- Minimum Passing Score: 75% (38 points)
- Subjects Involved (No. of Questions):
- Licensing Requirements (8)
- Estimating and Bidding (5)
- Business Organization and Financial Management (8)
- Tax Laws (5)
- Labor Laws (4)
- Project Management and Lien Law (5)
- Contracts (8)
- Risk Management (4)
- Environmental and Safety (3)
- PSI© Business & Law Official Content Outline
New Mexico Fixed Works (GF-98) Contractor Book Set
This set of books includes all required references for the GF Core, Fixed Works (GF-98) and Business and Law exams. Orders placed before 2 PM are shipped the same day via UPS and a tracking number is emailed before 3 PM.
NEW MEXICO FIXED WORKS (GF-98) - BOOK SET WITHOUT TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS
Sales price: $4,202.54-
NEW MEXICO FIXED WORKS (GF-98) - BOOK SET WITH TABS INCLUDES ALL BOOKS FOR TRADE AND BUSINESS EXAMS
Sales price: $4,302.54
New Mexico Airports (GF-1) Contractor Exam Books
Books Allowed in Testing
-
This practical text introduces students to th...Soils and Foundations
r275 1$181.53$181.53 -
The standard specifications contained in this...Airport Construction Standards FAA Advisory C
r637 1$201.94$201.94
New Mexico Bridges (GF-2) Contractor Exam Books
Books Allowed in Testing
-
This book is only available as a PDF, To purc...Construction Handbook for Bridge Temporary Wo
r816 1Sales price: $0.00Sales price: $0.00 -
Many advances have been made in concrete tech...Design and Control of Concrete Mixtures
r104 1$152.31$152.31 -
This is a used book, used book pricing has be...Handbook of Rigging For Construction and Indu
r157 1$63.39$63.39 -
This "how-to" manual presents state-of-the-ar...Hot Mix Asphalt Paving Handbook
r596 1$57.93$57.93 -
This book provides information on New Mexico'...New Mexico Specifications for Highway and Bri
r1250 1$278.44$278.44 -
A complete overview of all aspects of constru...Construction Planning Equipment and Methods
r102 1$227.29$227.29
New Mexico Canals, Reservoirs, or Irrigation Systems (GF-3) Contractor Exam Books
Books Allowed in Testing
-
Pipe & Excavation Contracting is an important...Pipe & Excavation Contracting
r246 1$53.66$53.66 -
Simplified Irrigation Design is an easy-to-un...Simplified Irrigation Design (Landscape Archi
r274 1$60.49$60.49 -
Many advances have been made in concrete tech...Design and Control of Concrete Mixtures
r104 1$152.31$152.31
New Mexico Drainage or Flood Control Systems (GF-4) Contractor Exam Books
Books Allowed in Testing
-
This guide is sold used but in good condition...Design and Construction of Urban Stormwater M
r388 1$86.70$86.70 -
This book provides information on New Mexico'...New Mexico Specifications for Highway and Bri
r1250 1$278.44$278.44 -
A complete overview of all aspects of constru...Construction Planning Equipment and Methods
r102 1$227.29$227.29 -
The Installation Guide for Ductile Iron Pipe ...Installation Guide for Ductile Iron Pipe
r166 1$49.09$49.09
New Mexico Recreation Areas (GF-5) Contractor Exam Books
Books Allowed in Testing
-
Many advances have been made in concrete tech...Design and Control of Concrete Mixtures
r104 1$152.31$152.31 -
Pipe & Excavation Contracting is an important...Pipe & Excavation Contracting
r246 1$53.66$53.66 -
This guide is sold used but in good condition...Design and Construction of Urban Stormwater M
r388 1$86.70$86.70 -
Simplified Irrigation Design is an easy-to-un...Simplified Irrigation Design (Landscape Archi
r274 1$60.49$60.49 -
This practical text introduces students to th...Soils and Foundations
r275 1$181.53$181.53 -
This book provides information on New Mexico'...New Mexico Specifications for Highway and Bri
r1250 1$278.44$278.44
New Mexico Tanks and Tower (GF-7) Contractor Exam Books
Books Allowed in Testing
-
The purpose of this standard is to provide mi...Welded Carbon Steel Tanks for Water Storage A
r835 1$140.89$140.89 -
This "how-to" manual presents state-of-the-ar...Hot Mix Asphalt Paving Handbook
r596 1$57.93$57.93 -
PEI’s Recommended Practices for Installatio...Recommended Practices for Installation of Und
r266 1$399.55$399.55 -
Pipe & Excavation Contracting is an important...Pipe & Excavation Contracting
r246 1$53.66$53.66 -
This official AWWA Manual of Water Supply Pra...Steel Water-Storage Tanks M42
r625 1$203.99$203.99
New Mexico Transmission Lines, Tanks, and Substations (NonElectrical) (GF-8) Contractor Exam Books
Books Allowed in Testing
-
OSHA (CFR 29 Part 1926) is the leading safety...CFR (OSHA) Title 29 Part 1926 (1903 1904 1910
r84 1$30.00$30.00 - {product id=8640}
-
This is a used book, used book pricing has be...Handbook of Rigging For Construction and Indu
r157 1$63.39$63.39 -
This "how-to" manual presents state-of-the-ar...Hot Mix Asphalt Paving Handbook
r596 1$57.93$57.93 - {product id=7935}
-
Pipe & Excavation Contracting is an important...Pipe & Excavation Contracting
r246 1$53.66$53.66 - {product id=7486}
- {product id=7487}
New Mexico Utility Lines (GF-9) Contractor Exam Books
Books Allowed in Testing
- {product id=11251;template=0;layout=booksStyle}
- {product id=7497}
-
This "how-to" manual presents state-of-the-ar...Hot Mix Asphalt Paving Handbook
r596 1$57.93$57.93 -
The Installation Guide for Ductile Iron Pipe ...Installation Guide for Ductile Iron Pipe
r166 1$49.09$49.09 -
This guide is sold used but in good condition...Design and Construction of Urban Stormwater M
r388 1$86.70$86.70 -
A complete overview of all aspects of constru...Construction Planning Equipment and Methods
r102 1$227.29$227.29
New Mexico CORE (GF) Contractor Exam Books
Books Allowed in Testing
- {product id=7478;template=0;layout=booksStyle}
-
This book provides information on New Mexico'...New Mexico Specifications for Highway and Bri
r1250 1$278.44$278.44 -
Pipe & Excavation Contracting is an important...Pipe & Excavation Contracting
r246 1$53.66$53.66 - {product id=11269}
- {product id=7433}
- {product id=96}
New Mexico Fixed Works (GF-98) Business and Law Exam Books
Books Allowed in Testing
- {product id=7465;template=0;layout=booksStyle}
- {product id=11252}
- {product id=11260}