How much Experience do I need for a Collier County Contractor's License?
The list of trades requiring licensure within Collier County and the requisite years of experience are shown below
Major Trades
- General Contractor - 48 months
- Building Contractor - 48 months
- Residential Contractor - 48 months
- Mechanical Contractor - 48 months as Journeyman
- Class "A" Air Conditioning Contractor - 36 months as Journeyman
- Class "B" Air Conditioning Contractor - 36 months as Journeyman
- Class "C" Air Conditioning Contractor - 24 months as Journeyman
- Master Electrician - 24 mo as Journeyman and 48 mo as Apprentice
- Master Plumber - 24 mo as Journeyman and 48 mo as Apprentice
- Journeyman Electrician - 48 months as Apprentice
- Journeyman Plumber - 48 months as Apprentice
- Journeyman Air Conditioning - 48 months as Apprentice
- Swimming Pool Class "A" (Commercial) - 36 months
- Swimming Pool Class "B" (Residential) - 24 months
- Swimming Pool Class "C" (Service) - 24 months
Specialty Trades
- Acoustical 24 months
- Aluminum/Screen Enclosure - 24 months
- Aluminum/Screen Enclosure w/ Concrete - 24 months
- Alarm System I (burglar and fire) - 24 months
- Alarm System II (burglar only,
- Cabinet Installation 24 months
- Carpentry 36 months
- Concrete Forming and Placing - 36 months
- Concrete Placing and Finishing - 36 months
- Concrete (pneumatically placed only) - 24 months
- Decorative Metal - 24 months
- Demolition or Wrecking - 36 months
- Dredging - 36 months
- Drywall - 36 months
- Epoxy Stone - 24 months
- Excavation - 36 months
- Exterior Covering by Artificial Stucco
- System - 24 months
- Fence Erection - 24 months
- Floor Covering Installation - 24 months
- Garage Door Installation - 12 months
- Gasoline Tank and Pump - 48 months
- Glass and Glazing - 24 months
- Hurricane Shutter/Awning - 24 months
- Insulation - All Types except Bldg - 36 months
- Insulation - Building - 24 months
- Irrigation Sprinkler - 24 months
- Landscaping Restricted - 12 months
- Marine, Seawall and Dock Construction - 36 months
- Masonry - 36 months
- Nonrecreational Pond Waterfall Fountain - 24 months
- Painting - 24 months
- Paving (commercial or unlimited) - 36 months
- Paving Blocks - 24 months
- Plastering and Stucco - 36 months
- Reinforced Steel - 36 months
- Roof Painting, Coating, and Cleaning - 24 months
- Roofing Unlimited - 36 months
- Sandblasting - 24 months
- Satellite Dish Installation - 24 months
- Sealing and Striping - 24 months
- Sheet Metal - 24 months
- Structural Steel Erection - 36 months
- Swimming Pool/Spa Servicing/Repair - 24 months
- Tile and Marble - 24 months
- Tile, Marble, and Terrazzo - 24 months
- Tree Removal and Trimming - 12 months
- Underground Utility and Excavation - 48 months