Article Index

City of Kissimmee Permits

To view license requirements, definition, exams, books, and classes, please visit Osceola County

Building Permits

In the City of Kissimmee, a grant is frequently needed preceding beginning work on your proposed project. Each permit requires to have street adress of project for the application. Aswell as description of work, business name, project cost, owners name, and telephone number. This applies to the permits listed down below.

New Commercial

Development of any new ad structure, secluded or shell, and parking structure including all necessary pipes, mechanical and electrical sub-licenses.

New Multi-Family Residential

Development of loft (condo) or trio that has at least three family homes with all the necessary pipes, mechanical and electrical sub-grants.

New Single Family Residential

Construction of a new single family dwelling unit, a townhouse or model with all the required plumbing, mechanical and electrical sub-permits.

Demolition

Entire or Partial & Relocation

Dumpster/Trash

Construction of an enclosure around a dumpster or trash can(s).

Enclosure Screen Room/Enclosure.

Construction of a screen room or porch enclosure that has a hard pan roof or open aired.

Exterior Structure Alteration

Siding-Doors-Windows. Minor construction work done on the exterior of a structure, such as the installation of siding (aluminum, wood, soffit or stucco); exterior door(s) and window(s).

Fences & Walls Foundation

Construction of a PVC, wood, aluminum, masonry, vinyl coated chain link or any other type of ornamental fence or wall.

Pool/Hot Tub/Jacuzzi/Spa

Construction of a pool, hot tub, Jacuzzi, or spa.

Roof-New Roof-Re-Roof-Roof Over

nstallation including truss, paneling, felt or shingles for new structures.Repair or tear off of existing roofs.Installation of a roof over existing material.

Shed/Garage/Car Port

Construction of a detached shed or garage that is prefabricated or built on site.

Permanent signs

Installation of ground signs (monument, way-finding, on-site directional and flag poles) and building signs (wall, projecting, under canopy, awning, directory, building identification, window and instructional).

Temporary signs

Displayed for a limited time such as banners, feather banners, cold air balloons, future occupant, model home, mobile trailer, non-profit off site directional and human signs.

Slab With/Without Footer

Construction of a flat concrete plate with supports of reinforced rebar poured into an excavated trench that is used typically for floors or those that do not support a structure.

Solar Panel

Installation of panels and its components used to generate electricity.

Mechanical

Installation of any mechanical equipment such as air conditioner installation (HVAC - heating, ventilation & air conditioning) or change out, hood, heating, walk-in cooler, duct work, and refrigeration, and when work is not done in conjunction with a new structure or building addition.

Electrical

Installation of any new electrical wiring, meters or fixtures when work is not done in conjunction with a new structure.

Plumbing

Plumbing improvements such as addition, alteration, new service, repair, general plumbing, gas, irrigation, and grease trap to any commercial, multi-family dwelling unit and single family dwelling unit.

Site Development & Tree Removal

Used for the debrushing and tree removal when not done in conjunction with a site construction project; the debrushing, grading, excavating filing and installation of utilities of land after site construction plans have been approved

Master File

For projects where multiple buildings of the same type are to be built.

Fire Protection

Installation of sprinklers, fire suppression system(s), alarm(s), smoke detector(s), underground fire main(s) and issuance of burn permit(s).